首页> 外文会议>HLW, LLW, mixed wastes and environmental restoration - working towards a cleaner environment >RESEARCH AND DEVELOPMENT ACTIVITIES IN SUPPORT OF HANFORD PRIVATIZATION – SRTC PROGRAM (U)
【24h】

RESEARCH AND DEVELOPMENT ACTIVITIES IN SUPPORT OF HANFORD PRIVATIZATION – SRTC PROGRAM (U)

机译:支持汉福德私有化的研究和开发活动– SRTC计划(U)

获取原文
获取原文并翻译 | 示例

摘要

A team led by BNFL, Inc. was awarded the contract to remediate and immobilize the Hanfordrnradioactive tank waste in support of the Hanford Tank Waste Remediation System programrn(TWRS). BNFL, Inc. is teamed with BNFL Engineering, LTD., Bechtel National, GTS Duratek,rnand Science Application International Corporation to develop and design integrated facilities forrnpretreatment and vitrification in support of the TWRS mission. This facility will pretreat andrnimmobilize approximately 0.375 MT/day of high level waste (HLW, producing 1.5 MT/day ofrnHLW glass) and approximately 4.5 MT/day of low activity waste (LAW, producing 30 MT/dayrnof LAW glass) during Part B2 of the TWRS project. During the initial phase of Part B (FY98 –rnFY00, B1), the technology is expected to be optimized to the point that it can be used as the basisrnfor final design, construction, and operation of a vitrification facility in Hanford, Washington.rnAs part of the overall Hanford Tank Waste Remediation System (TWRS) Project, BNFL, Inc.rnhas contracted DOE-Westinghouse Savannah River Company’s Savannah River TechnologyrnCenter (SRTC) to provide research and development services in characterization, pretreatment,rnand immobilization of actual Hanford tank wastes. Additionally, SRTC is developing designrnbasis data using simulants of Hanford tank wastes in areas of ion exchange, filtration,rnprecipitation, glass former blending, evaporation, and slurry mixing. This paper will provide anrnoverview of the SRTC TWRS development program.
机译:由BNFL,Inc.领导的团队获得了修复和固定Hanfordrn放射性罐体废物的合同,以支持Hanford罐体废物补救系统计划(TWRS)。 BNFL,Inc.与BNFL Engineering,LTD。,Bechtel National,GTS Duratek,rnand科学应用国际公司合作开发和设计用于预处理和玻璃化的综合设施,以支持TWRS任务。该工厂将在B2部分的第2部分中预处理和固定约0.375吨/天的高放废物(HLW,生产1.5吨/天的HLW玻璃)和约4.5吨/天的低活性废物(LAW,生产30吨/天的LAWL玻璃)。 TWRS项目。在B部分(FY98 –rnFY00,B1)的初始阶段,预计该技术将进行优化,以使其可以用作华盛顿州汉福德的玻璃化设施的最终设计,建造和运营的基础。 BNFL,Inc.是整个汉福德坦克废物修复系统(TWRS)项目的一部分,与美国能源部西屋萨凡纳河公司的萨凡纳河技术中心(SRTC)签约,以提供研究和开发服务,以对实际汉福德坦克废物进行定性,预处理,固定和固定。此外,SRTC正在使用汉福德槽式废物的模拟物开发离子交换,过滤,沉淀,玻璃形成器混合,蒸发和浆料混合等领域的设计基础数据。本文将提供SRTC TWRS开发计划的概述。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号