WHITE HOUSE INVOLVEMENT IN WARD VALLEY LAND TRANSFER DELAYS

机译:沃德河谷土地转让延迟中的白色房屋介入

获取原文
获取原文并翻译 | 示例

摘要

In 1993, California became the first state to license a new Compact disposal facility under thernsystem authorized by the Low-Level Radioactive Waste Policy Act as amended. Construction ofrnthe facility has been delayed by the federal government’s refusal to transfer the project propertyrnto the state. Government documents produced in litigation filed by the state and its licensee tornobtain the land and recover monetary damages confirm high-level White House involvement inrndecisions to delay the project. These documents further reveal that senior federal officialsrnconcluded that the project was safe, but that political considerations prevented delivery of thernland to California. Combined with siting reverses in other Compact regions, California’srninability to proceed casts substantial doubt on the ability of the Policy Act to produce the stablernnational disposal system envisioned by Congress.
机译:1993年,加利福尼亚州成为第一个根据修订的《低放射性废物政策法》授权的系统许可新的紧凑型处置设施的州。该设施的建设因联邦政府拒绝将项目财产移交给州而被推迟。由州政府及其被许可人提起诉讼的政府文件中,他们获得了土地,并获得了金钱赔偿,这证实了白宫高层的介入决定,以推迟该项目。这些文件进一步表明,联邦高级官员断定该项目是安全的,但出于政治考虑,无法将瑟恩兰德运送到加利福尼亚。加之其他紧凑型地区的情况相反,加利福尼亚州无法继续进行的做法使人们对《政策法》产生国会设想的稳定国家处置系统的能力产生了极大的怀疑。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号