【24h】

Tailing dams - practical problems of ageing

机译:尾矿坝-老化的实际问题

获取原文
获取原文并翻译 | 示例

摘要

The first tailing dams in the Czech Republic storing flying ash started to operate at the end of fifties. After nearly 40 years of operation some problems have appeared frequently connected with the functioning of the drainage system. The paper describes the problem connected with "Debrne" tailing dam where strong erosion of the flying ash started after the local failure of the concrete drainage gallery at the bottom of the deposited flying ash. Therefore practical steps that were used to reach stable conditions are described in more detail. Between these steps belong closing the outlet from drainage gallery followed by pore pressure increase, installation of wells to decrease pore pressure, injection of the drainage gallery front at the place of local failure, closing the drainage gallery in the lower part respecting filtration criteria to ensure that the rest of the gallery will work as a drainage, reconstruction of the concrete gallery from this point to the outlet.
机译:捷克共和国第一批储存飞灰的尾水坝于五十年代末开始运营。经过近40年的运行,排水系统的功能经常出现一些问题。本文描述了与“ Debrne”尾矿坝有关的问题,在该问题中,在沉积的飞灰底部的混凝土排水沟局部失效之后,飞灰开始受到强烈的侵蚀。因此,将更详细地描述用于达到稳定条件的实际步骤。在这些步骤之间包括关闭排水通道的出口,然后增加孔隙压力,安装井以降低孔隙压力,在局部失效的位置注入排水通道前部,关闭下部的排水通道以遵守过滤标准,以确保画廊的其余部分将用作排水设施,从此处到出口都将混凝土画廊重建。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号