首页> 外文会议>Environment and Electrical Engineering (EEEIC), 2012 11th International Conference on >Plant growth simulation algorithm for fuel cost minimization with emission limit and wind power
【24h】

Plant growth simulation algorithm for fuel cost minimization with emission limit and wind power

机译:具有排放限制和风能的燃料成本最小化的植物生长模拟算法

获取原文
获取原文并翻译 | 示例

摘要

This paper deals with scheduling of thermal generating units in wind integrated power system to meet the requirements of minimum emission. An emission due to thermal plants is considered as constraint while minimizing the overall cost of operation. The stochastic nature of wind power is characterized by weibull probability distribution function. The terms like overestimation and underestimation of available wind power are considered in present study to account for power imbalance due to wind power uncertainty. Plant growth simulated algorithm PGSA is used to solve cost function and is implemented as computer program. Two test systems are studied to demonstrate the effectiveness of proposed algorithm.
机译:为了满足最小排放的要求,本文对风力发电系统中的火电机组进行调度。火力发电厂产生的排放被视为限制因素,同时使总体运营成本降至最低。风能的随机性以魏布尔概率分布函数为特征。本研究中考虑了可用风能的高估和低估之类的术语,以解决由于风能不确定性导致的功率不平衡。植物生长模拟算法PGSA用于求解成本函数,并作为计算机程序实现。研究了两个测试系统,以证明所提出算法的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号