首页> 外文会议>Ensuring Reservoir Safety into the Future >Inoperable reservoir valves - why wait for the inspection?
【24h】

Inoperable reservoir valves - why wait for the inspection?

机译:储液阀无法操作-为什么要等待检查?

获取原文
获取原文并翻译 | 示例

摘要

Until recently Undertakers have had limited options for dealing with these problematic valves and usually they would only 'appear on the radar' and therefore be identified as requiring remedial action during statutory visits by a Panel Engineer.rnThis is understandable and until recently was unavoidable as conventional solutions are costly and disruptive perhaps requiring the use of divers or the need for a complete reservoir drawdown. Environment Agency requirements mean that a considerable amount of time and expense is involved in planning such an exercise in order to facilitate for example, a reservoir drawdown in order to enable a valve exchange.rnIn this day and age where risk management and climate change forces people to consider the consequences of the 'unthinkable' then this approach demands reconsideration.
机译:直到最近,承办商对于处理这些有问题的阀门的选择仍然有限,通常它们只会“出现在雷达上”,因此,在面板工程师的法定访问期间被确定为需要采取补救措施。rn这是可以理解的,直到最近还是常规情况下不可避免的。解决方案成本高昂且具有破坏性,也许需要使用潜水员或需要完全撤出水库。环境署的要求意味着,在规划此类演习时要花费大量的时间和金钱,以利于例如减少水库的使用量以实现阀门的更换。在当今这个时代,风险管理和气候变化迫使人们考虑“不可思议”的后果,那么这种方法需要重新考虑。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号