首页> 外文会议>Embedded topical meeting on decommissioning and remote systems 2014 >Cleansing and Dismantling of CEA-Saclay Nuclear Licensed Facilities; Project Perimeter
【24h】

Cleansing and Dismantling of CEA-Saclay Nuclear Licensed Facilities; Project Perimeter

机译:CEA-萨克莱核执照设施的清洗和拆除;项目周长

获取原文
获取原文并翻译 | 示例

摘要

This summary presents the cleansing and dismantling operations currently realized at the Saclay center of the "Commissariat a l'Energie Atomique" (French atomic energy commission -CEA-Saclay).It was initiated at the beginning of the year 2000, a cleansing and dismantling program of the old Nuclear Licensed Facilities ((NLF; Nuclear Licensed Facilities, translation of the French appellation: Installation Nucleaire de Base - INB). This summary presents the dismantling work and the studies progress from January 2012 to March 2014. The STEL ((Station de Traitement des Effluents Liquides - Liquid Waste Treatment Plant)) cleansing and dismantling operations and the LHA ((Laboratoires de Haute Activite - Height Activity Laboratories) dismantling operations are the subject of separate presentations [4] and [5].
机译:本摘要介绍了目前在“原子能委员会”(法国原子能委员会-CEA-Saclay)的萨克勒中心实现的清洗和拆除操作。该项目于2000年初启动,旨在进行清洗和拆除。旧的核许可设施的计划((NLF;核许可设施,法国称谓的翻译:安装核基地-INB)。该摘要介绍了2012年1月至2014年3月的拆除工作和研究进展。STEL((废物排放站-液体废物处理厂)的清洗和拆除操作以及LHA(高级活动实验室-高度活动实验室)的拆除操作是单独介绍的主题[4]和[5]。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号