首页> 外文会议>Embedded topical meeting on decommissioning and remote systems 2014 >French Decommissioning Feedback Experience and Lessons Learned
【24h】

French Decommissioning Feedback Experience and Lessons Learned

机译:法国退役反馈的经验和教训

获取原文
获取原文并翻译 | 示例

摘要

The French nuclear operators (CEA: research, EDF: utility and AREVA: fuel cycle) have experience in decommissioning of nuclear facilities, goes back many decades and relates to many installations of very different types. The first substantial operations began inside the French Atomic Energy Commission (CEA) in the late fifties, sixties and seventies, and included, for instance, the first plutonium plant at Fontenay-aux-Roses (total decommissioning in 1958) and a number of small research reactors and critical mock-ups such as Cesar and Peggy at Cadarache, and Minerve at Fontenay-aux-Roses (with civil engineering structures cleaned up but not demolished).
机译:法国核运营者(CEA:研究,EDF:公用事业和AREVA:燃料循环)在核设施退役方面有经验,可以追溯到几十年前,涉及许多非常不同类型的装置。五十年代末,六十年代和七十年代初期,法国原子能委员会(CEA)内部进行了第一批实质性运营,其中包括例如Fontenay-aux-Roses的第一家p工厂(1958年全面退役)和一些小型工厂。研究反应堆和关键模型,例如Cadarache的Cesar和Peggy以及Fontenay-aux-Roses的Minerve(已清理但未拆除的土木工程结构)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号