首页> 外文会议>Eleventh Asian Regional Conference on Soil Mechanics and Geotechnical Engineering Vol.1, Aug 16-20, 1999, Seoul/Korea >A construction monitoring using backward analysis in large excavation of foundation pit in Shanghai's soft ground
【24h】

A construction monitoring using backward analysis in large excavation of foundation pit in Shanghai's soft ground

机译:上海软土地基大型基坑开挖中的后向分析施工监测

获取原文
获取原文并翻译 | 示例

摘要

Many large excavations in soft ground of Shanghai are carried out recently and excavation depth of some foundation pits is over 16m. Therefore, construction of foundation pit has a great effect on the stabilities and deformations of retaining structure system, nearby buildings, surrounding soft soil ground and underground pipelines. Some serious troubles of project due to incorrect construction sequence occur in the last several years, which result a great economical damage. For reducing the bad influences on surroundings and guaranteeing project safety, a construction monitoring for large excavation of foundation pit is made by use of 2D-FEM backward analysis with staged construction simulation at the first time and thus a deformation forecast is carried out. A case study of foundation pit in soft ground of Shanghai is given and research results show the presented method is more powerful to practical engineering project and can guide project construction.
机译:最近上海软土地上进行了许多大型开挖,一些基坑的开挖深度超过16m。因此,基坑的施工对挡土结构体系,附近建筑物,周围软土地基和地下管线的稳定性和变形影响很大。最近几年,由于不正确的施工顺序,出现了一些严重的工程麻烦,造成了巨大的经济损失。为了减少对周围环境的不利影响并保证工程安全,首次利用二维有限元反分析和阶段性施工模拟对基坑大开挖进行了施工监控,并进行了变形预测。以上海某软土地基坑为例,研究结果表明,该方法对实际工程项目具有较强的实用性,可以指导工程建设。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号