首页> 外文会议>Deep Foundations Institute annual conference on deep foundations >'TREVI-CALATORE': INNOVATION IN CUT AND COVER AND TUNNELING FOR THE INSTALLATION OF PLUNGE COLUMNS AIMED TO EXCAVATE UNDERGROUND STRUCTURES THROUGH THE TOP-DOWN METHOD
【24h】

'TREVI-CALATORE': INNOVATION IN CUT AND COVER AND TUNNELING FOR THE INSTALLATION OF PLUNGE COLUMNS AIMED TO EXCAVATE UNDERGROUND STRUCTURES THROUGH THE TOP-DOWN METHOD

机译:“ TREVI-CALATORE”:切割,覆盖和隧道创新,用于通过自下而上的方法安装用于挖掘地下结构的柱塞柱

获取原文

摘要

The installation of foundation elements (large-diameter Bored Piles or Diaphragm Walls) for the execution of underground works to be performed through the 'Top Down' Technique (Stations, Car Parks, Subways, Artificial Tunnels) often requires the insertion, with pinpoint accuracy, of steel or prefabricated elements within the foundation system, to provide temporary and/or permanent support to the whole structure. The future high-speed railway station of Florence Belfiore (Italy) is a perfect example; the new station will be built in the Northwest area of Florence, about two kilometers far from the existing station of Santa Maria Novella. The project envisages installation of about 500 bored piles (1200-1500-2100 mm diameter), with lengths ranging between 50 and 70 m. In the upper inner part of 250 piles, a steel pipe (weight: 15-20 tons, length: 22-25 mt.) has to be inserted with pinpoint accuracy. The 'TREVI-CALATORE' system allows to install the plunge columns and adjust their position and verticality.
机译:为了通过“自上而下”技术(车站,停车场,地铁,人造隧道)执行地下工程,安装基础构件(大直径钻孔桩或地下连续墙)通常需要插入,而且要精确由基础系统中的钢或预制构件组成,以为整个结构提供临时和/或永久性支撑。未来的佛罗伦萨贝尔菲奥雷(意大利)高速火车站就是一个很好的例子。新站将建在佛罗伦萨的西北地区,距离新圣母玛利亚教堂现有站约两公里。该项目计划安装约500个钻孔桩(直径1200-1500-2100毫米),长度在50至70 m之间。在250根桩的上部内部,必须精确地插入一根钢管(重量:15-20吨,长度:22-25吨)。 “ TREVI-CALATORE”系统允许安装柱塞柱并调整其位置和垂直度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号