SEEPAGE ISSUES AT THE WARREN OHL DAM

机译:沃伦石油大坝的渗漏问题

获取原文
获取原文并翻译 | 示例

摘要

The Warren Ohl dam is located in central Pennsylvania and was built in 1964 as arnzoned soil and rock embankment with a length of 915 feet and maximum height of 55 feet.rnThe dam is underlain by nearly flat-laying sandstone, siltstone and shale that are generallyrnthinly bedded and vertically jointed. The dam is one of two water supply dams for the City ofrnLock Haven.rnSince its construction, seepage issues have plagued the dam. During 1965, upon initialrnfilling, seepage greatly exceeded the rate of inflow to the dam, and a foundation groutingrnprogram was conducted for the west abutment to enable the first filling of the reservoir. Inrn1978, an inspection of the dam indicated the need to control seepage exiting the toe area ofrnthe dam. Shallow drainage measures were initially installed, but were not sufficient to addressrnthe issue. An exploration program found the seepage through the embankment was beingrncontrolled satisfactorily by the central core; however, filtered pipe drains and a granularrnbuttress were added to control seepage exiting the lower portion of the downstream slope ofrnthe embankment. In early 1995, a sinkhole was found along the outside of the east wall of thernemergency spillway. Subsequent evaluations concluded that concentrated seepage along thernbase of the spillway from the underlying rock and cracks in the spillway base had permittedrnerosion of the soil subgrade from below the base of the concrete spillway. A filtered underdrainrnand replacement slab were designed for the spillway. During construction of the spillwayrnrepairs, springs were encountered in the newly exposed rock requiring increased drainagerncapacity to be incorporated into the repairs. In 2002, the Pennsylvania DEP Division of DamrnSafety requested that the City perform a rock grouting program to reduce and control thernseepage below the dam. This paper presents the history of the dam, the geology causing thernexcessive seepage problems, a geotechnical exploration of the dam, the basis for the designrnof spillway repairs and a grouting program, observations during construction, and conclusionsrnon the effectiveness of the repairs.
机译:沃伦·奥尔(Warren Ohl)大坝位于宾夕法尼亚州中部,始建于1964年,为带隆隆带的土壤和岩石路堤,长915英尺,最大高度为55英尺。分层并垂直接合。该水坝是rnLock Haven市的两座供水水坝之一。自建设以来,渗水问题困扰着该水坝。 1965年,最初的填筑过程中,渗流大大超过了流入大坝的速度,并且为西基台进行了基础灌浆计划,以实现对水库的首次填筑。 1978年,对大坝的检查表明有必要控制从大坝脚趾区域流出的渗流。最初安装了浅排水措施,但不足以解决该问题。一项勘探计划发现,通过堤防的渗流已被中心岩心满意地控制。但是,增加了过滤后的排水管和颗粒状的支撑,以控制从堤坝下游斜坡下部流出的渗流。 1995年初,在紧急溢洪道东壁的外侧发现了一个污水坑。随后的评估得出结论,溢洪道底部的岩石从溢洪道底部集中渗漏,溢洪道底部的裂缝使土壤路基从混凝土溢洪道底部下方侵蚀。为溢洪道设计了经过过滤的排水沟和更换板。在溢洪道维修的施工过程中,新暴露的岩石遇到了弹簧,需要将排水能力增加到维修中。在2002年,宾夕法尼亚州DamnSafety的DEP部门要求纽约市执行岩石灌浆计划,以减少和控制坝下的渗流。本文介绍了大坝的历史,引起过多渗流问题的地质,大坝的岩土勘察,设计溢洪道的修复和灌浆程序的基础,施工期间的观察以及结论,指出了修复的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号