首页> 外文会议>Creativity and collaboration >Crewe Green Link Road Underbridge - Tackling complex foundation analysis using first principles
【24h】

Crewe Green Link Road Underbridge - Tackling complex foundation analysis using first principles

机译:Crewe Green Link Road Underbridge-使用首要原则处理复杂地基分析

获取原文
获取原文并翻译 | 示例

摘要

The Underbridge is a key feature of the Crewe Green Link Road South, which lies approximatelyrn2km south-east of Crewe in Cheshire. The road is a 1.1km long standard two lane dual carriagewayrnrunning south to north from the A500 roundabout towards the A5020 roundabout. It passesrnunderneath the Kidsgrove to Crewe South Railway line, which is supported on a 4m highrnembankment, hence the need for the bridge. Project challenges and site constraints led to anrninnovative solution for the design of both the bridge and its foundations. This paper shows howrnfirst principles were used to form a robust but flexible concept design that struck a good balancernbetween innovation and project risk. The methodology adopted facilitated the collaborationrnbetween all project stakeholders and led to the successful conclusion of the project in Decemberrn2015.
机译:桥下是克鲁郡绿色链接之路的主要特征,它位于柴郡克鲁郡东南约2公里处。道路为1.1公里长的标准两车道双行车道,从A500环形交叉路口向南延伸至A5020环形交叉路口。它从Kidsgrove下穿过,到达Crewe南部铁路线,该线由4m高的堤岸支撑,因此需要桥梁。项目的挑战和工地的限制为桥梁及其基础的设计提供了创新的解决方案。本文展示了第一优先原则被用来形成一个健壮但灵活的概念设计,从而在创新与项目风险之间取得了良好的平衡。所采用的方法促进了所有项目利益相关者之间的合作,并导致该项目于2015年12月成功结束。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号