Mid-tunnel underground docking of tunnel boring machines in Singapore

机译:新加坡隧道中空隧道地下对接机

获取原文
获取原文并翻译 | 示例

摘要

Due to increased depth of tunneling, the time and cost involved in constructing a deep shaft is very high. In order to minimize the number of shafts and to shorten the construction period, it may be a viable option to drive TBM (Tunnel Boring Machine) from either side (of stations/portals) so they could meet midway. The TBMs could be then docked to establish a safe working chamber for concluding construction works including the TBM dismantling, internal concrete lining etc., without the need for any intermediate TBM retrieval shaft. This paper presents a case study of such TBM mid-tunnel docking performed in Singapore and also discusses details of structural design of temporary ground support system, analysis of settlement, assessment of potential impact on structures above the docking location and excavation sequencing.
机译:由于掘进深度的增加,建造深井的时间和成本非常高。为了最大程度地减少竖井的数量并缩短工期,从(站/门)的任一侧驱动TBM(隧道掘进机)可能是可行的选择,以便它们可以在中途相遇。然后可以将TBM停靠以建立一个安全的工作室,以完成包括TBM拆卸,内部混凝土衬里等在内的建筑工程,而无需任何中间的TBM回收井。本文介绍了在新加坡进行的这种TBM中隧道对接的案例研究,还讨论了临时地面支撑系统的结构设计,沉降分析,对对接位置上方结构的潜在影响评估和开挖顺序的细节。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号