NB Power's 66 MW Grand Falls Generating Station is located on the St. John River in north western New Brunswick. The four unit station went into service in 1928 and has a capacity factor of some 80%. The winter of 2007/2008 saw higher than usual amount of snowfall present in the St. John River Basin above Grand Falls, with the water equivalent in that snow pack some 60% above average. In late April 2008, a heavy rainstorm occurred in the northern reaches of the basin with some areas recording up to 100 mm of rain. The river flow and the resulting water stage reached unprecedented levels. A flood protection retaining wall protecting the Powerhouse was destroyed by the unrelenting water surges. Ultimately the station was flooded with some 2 meters of water over the main Powerhouse floor. This paper describes the project to return the station to commercial operation with all four units returning to service just 5 months after the flood. The project provided the opportunity to upgrade and modernize station ancillary equipment and systems. The Powerhouse and Switchyard were also fortified against future such events.
机译:NB Power的66兆瓦大瀑布发电站位于新不伦瑞克省西北部的圣约翰河上。四个单元的车站于1928年投入服务,其容量系数约为80%。 2007/2008年冬季,大瀑布上方的圣约翰河流域降雪量高于平常,该积雪中的水当量比平均水平高出约60%。 2008年4月下旬,流域北部发生了一场大暴雨,一些地区的降雨高达100毫米。河流流量和由此产生的水位达到了前所未有的水平。持续不断的水涌破坏了保护发电站的防洪挡土墙。最终,电站在Powerhouse的主要楼层上淹没了约2米的水。本文介绍了该项目使该站恢复商业运营,而四个单元在洪水发生后仅5个月就恢复了运行。该项目提供了升级站附属设备和系统并使之现代化的机会。 Powerhouse和Switchyard还针对未来的此类事件加强了防御。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号