The U.S. Route 46 Bridge over Overpeck Creek in New Jersey, USA neededrnsignificant rehabilitation due to the poor condition of its superstructure system. The project wasrnone of the first to be on NJDOT's hyper-design/hyper-build schedule. On this project, deliveryrntime was reduced from 48 months to 6 months. Project features included replacing the existingrndeck and steel superstructure with the Inverset Bridge System; replacing the existing rockerrnbearings with seismic isolation bearings; using precast concrete pedestals; performingrnunderwater substructure repairs; and utilizing a temporary gantry system and staged constructionrnthat allowed the bridge to remain open during demolition and erection activities.
机译:由于上层建筑系统状况不佳,美国新泽西州Overpeck Creek上的46号公路大桥需要进行重大修复。该项目是第一个按NJDOT的超设计/超建造时间表进行的项目。在这个项目上,交货时间从48个月减少到6个月。项目的特点包括用Inverset桥系统代替现有的甲板和钢结构。用防震轴承代替现有的摇臂轴承;使用预制混凝土基座;进行水下水下结构的维修;以及利用临时龙门系统和分阶段施工,使桥梁在拆除和安装过程中保持打开状态。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号