DOTs are interested in developing guidelines for use of large diameter corrugated HDPE pipernburied under roadways with shallow fill, but this application has not been studied extensively. Arnpooled fund study consisting of full-scale field tests and computer modeling has been initiated tornaddress this matter. The objectives of the project are to improve understanding of the behaviorrnof large diameter thermoplastic culverts under low fill heights, and develop design andrninstallation procedures for inclusion in DOT and AASHTO specifications.rnThe field tests are being conducted at the MnRoad Research Facility, which maintains a two-lanerntest road traversed only by test vehicles, a truck with a maximum axle load of 107 kN (24,000 lb)rntravels in one lane and a truck with 80 kN (18,000 lb) maximum axle load travels in the other.rnTen 20 m (65 ft) runs of 1,500 mm (60 in.) diameter test pipe were installed. Test pipe consistedrnof eight runs of thermoplastic pipe, and one run each of reinforced concrete and corrugated steelrnpipe. Nominal installation depths were 0.3 m and 0.6 m (1 ft and 2 ft) to the top of pavement.rnBackfill materials were A-1 and A-2 soils per AASHTO M145. Backfill compaction effort wasrnminimal. Pipes were instrumented with strain gages, displacement transducers, soil pressurerncells, and thermocouples. All instruments are connected to dataloggers that are remotelyrnaccessed via an internet connection.rnThis paper reports on the installation of the test pipe and early results on pipe performance.rnDeflections and strains are small. There has been some settlement in the backfill due to the lowrncompaction levels.
机译:交通运输部(DOT)有兴趣制定使用大直径波纹HDPE管道埋在浅层巷道下的使用指南,但尚未对此应用进行广泛的研究。为了解决这个问题,已经开始进行由全面的现场测试和计算机建模组成的Arnpooled基金研究。该项目的目标是增进对低填充高度下大直径热塑性涵洞行为的了解,并开发设计和安装程序以纳入DOT和AASHTO规范。rnRoad研究设施正在进行现场测试,该设备保持两个-仅测试车辆经过的最宽测试道路,一辆最大车轴负荷为107 kN(24,000 lb)的卡车在一个车道上行驶,而最大车轴负荷为80 kN(18,000 lb)的卡车在另一车道上行驶。20 m(65安装了直径1,500毫米(60英寸)的英尺管。试验管由八根热塑性管组成,每根由钢筋混凝土和波纹钢管组成。到人行道顶部的标称安装深度为0.3 m和0.6 m(1 ft和2 ft)。根据AASHTO M145,回填材料为A-1和A-2土。回填压实工作量最小。用应变计,位移传感器,土壤压力传感器和热电偶对管道进行检测。所有仪器都连接到可通过Internet远程访问的数据记录器。rn本文介绍了测试管道的安装以及管道性能的早期结果。rn挠度和应变很小。由于压实水平低,回填中有一些沉降。

著录项

  • 来源
  • 会议地点 Cleveland OH(US);Cleveland OH(US);Cleveland OH(US)
  • 作者单位

    Principal, Simpson Gumpertz Heger Inc., 297 Broadway, Arlington, MA 02474 phone 781-641-7240tjmcgrath@sgh.com;

    Simpson Gumpertz Heger Inc., 297 Broadway, Arlington, MA 02474 phone 781-641-7255sjdellorusso@sgh.com;

    State Hydraulics Engineer, Office of Bridges and Structures, Minnesota Department of Transportation, 3485Hadley Avenue North, Oakdale, MN 55128 phone 651-747-2162 John.Boynton@dot.state.mn.us;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 管道设备;管道运输;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号