首页> 外文会议>Beneath our feet: challenges and solutions >An Aggressive I/I Abatement Program is Underway as Part of Vallejo's Wet Weather Program
【24h】

An Aggressive I/I Abatement Program is Underway as Part of Vallejo's Wet Weather Program

机译:作为Vallejo潮湿天气计划的一部分,正在进行积极的I / I减排计划

获取原文
获取原文并翻译 | 示例

摘要

The Vallejo Sanitation and Flood Control District (VSFCD) is undertaking an aggressivernpilot program to control wet weather flows and eliminate sanitary sewer overflows (SSO's)rnthat are in violation of its NPDES permit. The program involves extensive rehabilitation ofrnsewer mains, manholes, and service laterals (including laterals on private property) in fivernselected basins to remove defects that allow rainfall dependent infiltration and inflow (I/I) tornenter the sewer system. The rehabilitation projects were designed through extensive analysisrnof the District's system, including CCTV and smoke testing inspections, comprehensivernmapping of the system in a GIS format, flow monitoring, hydraulic modeling, assessment ofrnhistorical SSO records, and evaluation of maintenance records. This paper will present thernprocess of developing and implementing the I/I abatement program. Significant issues to bernconsidered include the following:rn1. Comprehensive development of maps and databases in GIS formatrn2. Analysis of inspection and hydraulic datarn3. Development of a pilot program to test the effectiveness of I/I abatementrn4. Issues related to replacing service laterals on private propertyrn5. Development of construction documentsrn Construction/implementation of the pilot programrn6. Next steps.
机译:瓦列霍环卫与防洪区(VSFCD)正在实施一项积极的试点计划,以控制潮湿的天气流量并消除违反其NPDES许可的下水道溢流(SSO)。该计划包括在五个选定的盆地中对下水道的干管,人孔和服务分支(包括私有财产的分支)进行广泛的修复,以消除缺陷,使依赖降雨的入渗和入流(I / I)侵蚀下水道系统。通过对区域系统的广泛分析来设计修复项目,包括闭路电视和烟雾测试检查,以GIS格式对系统进行全面映射,流量监控,水力建模,历史SSO记录评估和维护记录评估。本文将介绍开发和实施I / I减排计划的过程。要考虑的重要问题包括:1。以GIS格式全面开发地图和数据库。检查和水力数据分析3。制定试验计划以测试I / I消除的有效性4。与更换私有财产上的服务分支有关的问题rn5。制定施工文件rn试点项目的施工/实施6。下一步。

著录项

  • 来源
  • 会议地点 Cleveland OH(US);Cleveland OH(US);Cleveland OH(US)
  • 作者

    Mike Walkowiak; Rolf Ohlemutz;

  • 作者单位

    CH2M HILL, 155 Grand Avenue, Suite 1000, Oakland, CA 94612, 510-251-2888 x2273mwalkowi@ch2m.com;

    Vallejo Sanitation and Flood Control District, 450 Ryder Street, Vallejo, CA 94590-7299707-644-8949 x231 rohlemutz@vsfcd.com;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 管道设备;管道运输;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号