首页> 外文会议>ASME/ASCE/IEEE joint rail conference 2011 >SHARED CORRIDORS, SHARED INTERESTS
【24h】

SHARED CORRIDORS, SHARED INTERESTS

机译:共享走廊,共享兴趣

获取原文
获取原文并翻译 | 示例

摘要

What are some of the practical obstacles to a "shared interests" between a freight railway business and the proposed new higher speed passenger entity? This paper discusses the real "tension" between the two business interests that fund freight trains versus those that support and fund higher speed passenger trains as they attempt to share the same tracks in a safe manner. There are fundamental laws of physics that have to be addressed as the two different sets of equipment are "accommodated" on a shared corridor. This may not always be an easy accommodation between the two commercial parties. One real tension between the two commercial interests involves the physical problem of accommodating two radically different train sets on areas of curved track. For one example, what will be the passenger train required future higher speeds and how will these speeds be accommodated in existing main line tracks with curves varying from 1% to 6% in degrees? How much super elevation will need to be put back into the heretofore freight train tracks? How will the resulting super elevation affect the operation of so called drag or high tonnage slow speed bulk cargo trains? Accommodating such differences in train set types, axle loadings, freight versus passenger train set speeds, requires making detailed choices at the engineering level. These may be shared interests, but they are also variables with far different outcomes by design for the two different business types. The freight railways have spent the last few decades "taking the super elevation out" because it is not needed for the modern and highly efficient freight trains. Now the requirements of the passenger trains may need for it to be replaced. What are the dynamics and fundamental engineering principles at work here? Grade crossings have a safety issue set of interests that likely require such things as "quad" gates and for the highest passenger train speeds even complete grade separation. Track accommodating very high speed passenger trains requires under federal regulations much closer physical property tolerances in gauge width, track alignment, and surface profile. This in turn increases the level of track inspection and track maintenance expenses versus the standard freight operations in a corridor. Fundamentally, how is this all going to be allocated to the two different commercial train users? What will be the equally shared cost and what are examples of the solely allocated costs when a corridor has such different train users? In summary, this paper provides a description of these shared issues and the fundamental trade-offs that the parties must agree upon related to overall track design, track geometry, track curvature, super elevation options, allowed speeds in curves, more robust protection at grade crossings, and the manner in which these changes from the freight only corridors are to be allocated given the resulting much higher track maintenance costs of these to be shared assets.
机译:货运铁路业务与拟议的新的高速客运实体之间的“共同利益”有哪些实际障碍?本文讨论了资助货运列车的两个商业利益与支持和资助高速旅客列车的两个商业利益之间的真正“张力”,因为他们试图以安全的方式共享相同的轨道。必须解决物理的基本定律,因为将两组不同的设备“容纳”在共享的走廊上。这在两个商业团体之间可能并不总是那么容易。两种商业利益之间的真正紧张关系涉及在弯曲轨道区域上容纳两个根本不同的列车组的物理问题。举一个例子,未来需要更高速度的旅客列车是什么?这些速度将如何适应现有干线轨道(弯度在1%到6%之间变化)?迄今为止,货运列车轨道需要放回多少高程?由此产生的超高将如何影响所谓的阻力或高吨位慢速散货列车的运行?为了适应列车组类型,车轴负载,货运与旅客列车组速度之间的这种差异,需要在工程水平上进行详细选择。这些可能是共同的利益,但对于两种不同的业务类型,它们的设计结果也会有很大的不同。在过去的几十年中,货运铁路“取消了超高标”,因为现代高效的货运列车不需要它。现在,可能需要替换旅客列车的要求。在这里工作的动力和基本工程原理是什么?平交道口具有一系列安全问题,可能需要诸如“四重”门之类的东西,并且对于最高的旅客列车速度,甚至需要完全隔离坡道。根据联邦法规,容纳超高速客车的轨道需要在轨距宽度,轨道对准和表面轮廓上具有更紧密的物理性能公差。与走廊中的标准货运运营相比,这又增加了轨道检查和轨道维护费用的水平。从根本上讲,这一切将如何分配给两个不同的商业列车用户?当走廊有如此不同的火车使用者时,将平均分担什么费用?单独分配的费用有哪些示例?总而言之,本文描述了这些共同的问题,以及各方必须同意的与总体轨道设计,轨道几何形状,轨道曲率,超高海拔选择,允许的弯道速度,更稳健的坡道保护有关的基本权衡考虑到这些共享资产所产生的更高的轨道维护成本,将对这些交叉路口以及从仅货运通道产生的变化进行分配的方式进行分配。

著录项

  • 来源
  • 会议地点 Pueblo CO(US);Pueblo CO(US)
  • 作者单位

    ZETA-TECH A Harsco Rail Business Unit 900 Kings Highway North Suite 208 Cherry Hill, New Jersey, USA;

    ZETA-TECH A Harsco Rail Business Unit 900 Kings Highway North Suite 208 Cherry Hill, New Jersey, USA;

    ZETA-TECH A Harsco Rail Business Unit 900 Kings Highway North Suite 208 Cherry Hill, New Jersey, USA;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 铁路运输;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号