The Lee County WTE Expansion Project Building a New WTE Unit in the 21st Century

机译:李县WTE扩建项目,在21世纪建设新的WTE单位

获取原文
获取原文并翻译 | 示例

摘要

The Lee County Expansion Project is a 636 ton per day Municipal Waste Combustor (MWC) in late stages of construction/startup, located in Ft. Myers, FL. The new unit complements the existing 1200 ton per day two-unit facility owned by the County and operated by Covanta Lee, Inc., which has been in service since 1994. The new unit is the first MWC permitted and constructed under the EPA's New Source Performance Standards (NSPS) since they were promulgated in the 1990's. This paper will describe the basic contractual arrangements, permitting, design and construction features, and overall costs for the expansion project.
机译:Lee县扩建项目位于Ft,是一座日产636吨的市政废物燃烧器(MWC),处于后期建设/启动阶段。佛罗里达州迈尔斯。新装置补充了该县拥有并由Covanta Lee,Inc.运营的现有日处理能力为每天1200吨的两单元装置,该装置自1994年起投入服务。新装置是EPA的新排放源允许并建造的第一台MWC。绩效标准(NSPS)自1990年代颁布以来。本文将描述扩建项目的基本合同安排,许可,设计和施工特点以及总成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号