首页> 外文会议>AHS International Annual Forum vol.1; 20070501-03; Virginia Beach,VA(US) >Design and Evaluation of the UH-60M CAAS Crew Station
【24h】

Design and Evaluation of the UH-60M CAAS Crew Station

机译:UH-60M CAAS机组人员站的设计与评估

获取原文
获取原文并翻译 | 示例

摘要

The UH-60M Black Hawk modernization program was established to meet the new requirements for supporting the US Army's Future Force. This includes increased lift, range, reliability, maintainability, survivability, and digitized capability for the future battlefield. The UH-60M crew station and avionics improvements represent the most significant changes in the Black Hawk configuration The modernization program has already produced a fully digital "glass" crew station that is designed to enhance tactical and flight situation awareness and decrease pilot workload. The UH-60M 'Baseline' completed initial operational testing in early FY07 and will be fielded to Army Aviation units starting in FY08. In 2005, the Army's Utility Helicopter Program Office (UH-PO) moved forward with the UH-60M 'Upgrade' program. The heart of this follow-on program is the move to the Common Avionics Architecture System (CAAS) and a fly-by-wire (FBW) flight control system. The CAAS configuration includes four portrait-style MFDs, a flight director control panel (FDCP), two control display units (CDU), and two data concentrators. This paper will detail the design and evaluation of the new UH-60M Upgrade crew station during the System Development and Demonstration phase of acquisition. This highly valuable Crew Station Working Group (CSWG) process has provided the opportunity to influence the design of the cockpit early in the acquisition cycle and allows significant user input to the acquisition process. The UH-60M CSWG process has shown to be a highly valuable part of the design and development of the modernized Black Hawk program. An invaluable enabler to the CSWG process has been AMRDEC's Advanced Prototyping and Experimentation (APEX) Labs and the rapid-prototyping, reconfigurable UH-60M crew station.
机译:UH-60M黑鹰现代化计划的建立是为了满足支持美国陆军未来部队的新要求。这包括增加的升力,范围,可靠性,可维护性,生存能力以及未来战场的数字化能力。 UH-60M机组站和航空电子设备的改进代表了“黑鹰”(Black Hawk)配置中的最重大变化。现代化计划已经产生了全数字“玻璃”机组站,其目的是增强战术和飞行情况意识并减少飞行员的工作量。 UH-60M“基准”在2007财年年初完成了初始运行测试,并将从08财年开始部署到陆军航空兵部队。 2005年,陆军通用直升机计划办公室(UH-PO)推进了UH-60M“升级”计划。此后续计划的核心是向通用航空电子架构系统(CAAS)和线控飞行(FBW)飞行控制系统的转移。 CAAS配置包括四个纵向样式的MFD,一个飞行指导控制面板(FDCP),两个控制显示单元(CDU)和两个数据集中器。本文将在采购的系统开发和演示阶段,详细介绍新的UH-60M升级乘员站的设计和评估。这一非常有价值的乘员站工作组(CSWG)过程为在购置周期的早期影响驾驶舱的设计提供了机会,并允许大量用户输入购置过程。 UH-60M CSWG流程已证明是现代化黑鹰计划的设计和开发中非常有价值的一部分。 CSWG流程的重要推动力是AMRDEC的高级​​原型和实验(APEX)实验室以及快速原型,可重新配置的UH-60M乘员站。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号