首页> 外文会议>Advances in hydraulic physical modeling and field investigation technology. >Operation and Appraisal of Vertical Ship-lift at Shuikou Hydropower Station in Fujian Province
【24h】

Operation and Appraisal of Vertical Ship-lift at Shuikou Hydropower Station in Fujian Province

机译:福建省水口水电站垂直升船作业与评价

获取原文
获取原文并翻译 | 示例

摘要

The navigation facility at Shuikou Hydropower Station, 2 X 500t vertical ship-lift, which is of wet full-balanced wire rope-hoisted type with its maximum vertical lift range of 59. 00m, is a large-sized one, ranking first among the overseas and domestic shiplifts of the kind. It is a system engineering involving multi-specialties and multi-disciplines. With the unremitting efforts of the constructors, it was finally completed and successfully put into operation. This article gives a brief presentation with respect to the operation and appraisal of the aforesaid ship-lift.
机译:水口水电站2 X 500t垂直升船机的导航设施是湿式全平衡钢丝绳悬挂式,最大垂直升程为59. 00m,是大型的,在世界上排名第一。国外和国内的那种升降机。它是一个涉及多专业和多学科的系统工程。在建设者的不懈努力下,它终于完成并成功投入运行。本文简要介绍了上述升船机的运行和评估。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号