首页> 外文会议>Advanced materials design and mechanics >The study of the plastic cover mold design and process optimization based on Moldflow
【24h】

The study of the plastic cover mold design and process optimization based on Moldflow

机译:基于Moldflow的塑料盖模具设计与工艺优化研究。

获取原文
获取原文并翻译 | 示例

摘要

In this paper, according to the quality problems of the plastic cover such as the difficulty control of the mold temperature, long cooling time, low production efficiency and deformation, it analyses the problems existing in the mold causes and find solutions based on Moldflow as a research tool. By improving the quality of gate position to control the filling quality, redesigning the cooling system to improve cooling efficiency, optimizing molding process to control product quality and increasing wall thickness to eliminate air traps and weld lines guide the design and manufacturing of the new mould. It establishes the gating system and cooling system based on the ASA778T as filling material and the analysis of simplified model. Select the process: the mold surface temperature is 80℃, the melt temperature is 240℃, the mold-open time is 15s, the packing time is 10s, the packing pressure is 80Mpa, injection+packing+cooling time is 45s. This process reduces the molding cycle from 65s to 42s, decreases the maximum deformation in 2.866mm, ensures the product quality, saves the cost and improves the production efficiency.
机译:本文针对塑料盖的质量问题,如模具温度控制难度大,冷却时间长,生产效率低,变形等问题,分析了模具中存在的问题,并以Moldflow作为解决方案。研究工具。通过提高浇口位置的质量来控制填充质量,重新设计冷却系统以提高冷却效率,优化成型工艺以控制产品质量并增加壁厚以消除气阱和熔接线,从而指导新模具的设计和制造。建立了以ASA778T为填充材料的浇口系统和冷却系统,并对简化模型进行了分析。选择工艺:模具表面温度为80℃,熔体温度为240℃,开模时间为15s,保压时间为10s,保压压力为80Mpa,注射+保压+冷却时间为45s。该工艺将成型周期从65s缩短至42s,最大变形量降低了2.866mm,确保了产品质量,节省了成本并提高了生产效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号