【24h】

Simulation of Proposal Evaluation Activities in a Regional Operational Programme

机译:在区域运营计划中模拟提案评估活动

获取原文
获取原文并翻译 | 示例

摘要

The Regional Operating Programme of Thessalia (ROP-Th) is one of the 24 operational programmes (13 regional and 11 area specific) funded by the 3rd European Community Support Framework (CSF), the aim of which is to reduce the gap in economic development between Greece and the other member states of the European Union. The total budget of the CSF dedicated to the ROP of Thessalia is almost 1 billion euros. Administration of the ROP-Th is the main duty of the Programme Managing Authority (PMA), a public regional authority which is responsible to proclaim, evaluate and monitor hundred of projects that implement the ROP's objectives and priorities. This paper presents a simulation model to support the PMA in order to perform management and scheduling decisions on initial ROP's purchasing activities (i.e., setting-up calls for proposals, proposals receipt and eligibility checks, proposals evaluation and generation of contracts). The objective of the simulation model is to help PMA management to exploit efficiently all involved human resources (proposal evaluators) in the evaluation process by correlating simulated data with actual data based on the programme history. Simulation can be applied to estimate delays and identify, in quantified terms, the effects of re-engineering the purchasing process.
机译:Thessalia区域运营计划(ROP-Th)是由第三欧洲共同体支持框架(CSF)资助的24个运营计划(13个区域和11个特定区域)之一,其目的是缩小经济发展差距在希腊和欧盟其他成员国之间。用于塞萨利亚ROP的CSF的总预算接近10亿欧元。 ROP-Th的管理是计划管理机构(PMA)的主要职责,该机构是一个公共区域机构,负责宣布,评估和监视数百个实施ROP目标和优先级的项目。本文提出了一个支持PMA的仿真模型,以便对初始ROP的购买活动(即设置提案征集,提案接收和资格检查,提案评估和合同生成)执行管理和计划决策。模拟模型的目的是通过基于程序历史记录将模拟数据与实际数据相关联,以帮助PMA管理人员有效地利用评估过程中涉及的所有人力资源(投标评估师)。仿真可用于估计延迟并以量化的方式识别重新设计采购流程的效果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号