首页> 外文会议>WEFTEC 2011;Annual Water Environment Federation technical exhibition and conference >Onondaga County’s CSO Abatement Program - Lessons Learned and Overcoming Challenges of Large Scale Green Infrastructure Deployment
【24h】

Onondaga County’s CSO Abatement Program - Lessons Learned and Overcoming Challenges of Large Scale Green Infrastructure Deployment

机译:奥农达加县(Onondaga County)的CSO减排计划-汲取的经验教训和克服大规模绿色基础设施部署的挑战

获取原文
获取原文并翻译 | 示例

摘要

Onondaga County New York has been implementing an amended consent judgment (ACJ) forrncontrol of combined sewer overflows (CSO) to Onondaga Lake since January 1999. Throughrnthe leadership of the newly elected County Executive, Joanne M. Mahoney, the ACJ wasrnamended again in November 2009, the ACJ was amended again in November 2009 tornincorporate green infrastructure (GI) strategies to further reduce wet weather overflows and tornreplace a portion of the planned grey infrastructure. The new program, called “Save the Rain,” isrnimplementing various projects to confirm performance metrics as part of a system-wide build outrnof green infrastructure to meet the ACJ requirements. The CSO capture goals embodied in thernACJ will require green infrastructure to be significantly scaled up throughout the city to increasernCSO capture by 6% and overall system capture to 95%. Developing targeted implementationrnapproaches for green infrastructure is a primary focus of the program in order to use greenrninfrastructure to manage over 470 acres of impervious area. The program is addressing manyrnissues both technical and policy oriented in nature to develop GI implementation programs tornscale up implementation to the required levels in the ACJ.
机译:自1999年1月以来,纽约奥南达加县一直在执行经修订的同意书判决(ACJ),控制对奥南达加湖的下水道溢流(CSO)。在新当选的县级行政人员乔安妮·马洪尼(Joanne M. Mahoney)的领导下,ACJ于2009年11月再次被撤销。 ,ACJ于2009年11月再次进行了修订,纳入了绿色基础设施(GI)策略,以进一步减少潮湿天气的溢出并撕毁部分计划中的灰色基础设施。这个名为“拯救雨水”的新计划正在实施各种项目,以确认性能指标,并将其作为满足ACJ要求的全系统范围内绿色基础设施的一部分。 rnACJ中体现的CSO捕获目标将要求在整个城市显着扩大绿色基础设施,以将rnCSO捕获增加6%,并将整个系统捕获增加到95%。该计划的主要重点是开发绿色基础设施的有针对性的实施方案,以便使用绿色基础设施来管理470英亩的不渗透区域。该计划正在解决本质上以技术和政策为导向的许多问题,以开发地理标志实施计划,以将实施扩大到ACJ所需的水平。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号