Indian Charge Chrome Limited (ICCL) a member of the IMFA Group commissioned a 48 MVA stationary, covered and submerged arc furnace specially designed to produce High Carbon Ferro Chrome/ Charge Chrome during March, 1990. During 1999, it was observed that the furnace shell was bulging out near the tap hole zone. This bulge gradually began to increase and soon a gap started to develop between the shell plate and the bottom plate By mid 2001, it became clear that the furnace had to be shut down soon for a complete furnace relining. Since a shut down looked inevitable, based on history and past performance, plans were also drawn up to make other modifications during the relining period with a view to improve furnace availability. This added immensely to the complexity of the entire exercise. While initial planning forecasted a minimum relining period of 75 days, in view of market commitments, a task force was assembled with a mandate to complete the job in 48 days. This paper summarizes the steps taken by IMFA Group in completing not just the entire furnace relining but also all the modifications needed in a period of only 41 days.
机译:IMFA集团的成员Indian Charge Chrome Limited(ICCL)于1990年3月调试了一台48 MVA固定,有盖和埋弧炉,该炉专门设计用于生产高碳铬铁/ Charge Chrome。在1999年,观察到炉壳在龙头孔区域附近鼓出。这种隆起逐渐开始增大,并且很快在壳板和底板之间开始形成缝隙。到2001年中期,很明显必须立即关闭熔炉以完成熔炉的完全衬砌。由于关闭是不可避免的,因此根据历史和过去的表现,还制定了计划在修整期间进行其他修改,以提高熔炉利用率。这极大地增加了整个练习的复杂性。最初的计划预测最短的补休期为75天,但鉴于市场承诺,一个工作组已成立,任务是在48天内完成工作。本文总结了IMFA集团采取的步骤,不仅可以完成整个炉衬,而且还可以在41天内完成所有所需的修改。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号