首页> 外文会议>The 3rd international symposium on modern mining amp; safety technology proceedings >Integrated Study on the Covered Karstic Collapse Columns in 3-2 Belt Roadway Area of Fangezhuang Mine
【24h】

Integrated Study on the Covered Karstic Collapse Columns in 3-2 Belt Roadway Area of Fangezhuang Mine

机译:范庄矿3-2带巷道覆岩陷落柱综合研究。

获取原文
获取原文并翻译 | 示例

摘要

The hydro geological condition is very complicated in Fangezhuang Mine, in which water gushing (water yield more than 1.0m/min) has got to 26 times from well construction to now. The water burst accidents, which induced by covered karstic collapse columns, affected the Mine design and saftey in production and restricted coal mining and district continuation. In order to find out the influence of karstic collapse columns to the 3-2 belt roadway design, the integrated study was carried out in the area of 3-2 belt roadway, by using technical means, such as geophysical prospecting, drilling, discharge fluid test and water quality monitoring and so on. Through the study above, the identifiable position of the covered karstic collapse column was located, the original belt roadway design was modified in time, which not only avoid a potential man-made mine flooding accident and large numbers of money on the engineering, but also save plenty of funds that unnecessary.
机译:方庄矿的水文地质条件十分复杂,从井建设到现在,涌水量(出水量大于1.0m / min)已达到26倍。覆盖的岩溶塌陷柱引起的突水事故影响了矿山的设计和生产的安全性,并限制了煤矿开采和区域延续。为了找出岩溶塌陷柱对3-2带巷道设计的影响,利用地球物理勘探,钻井,排液等技术手段对3-2带巷道区域进行了综合研究。测试和水质监测等。通过以上研究,确定了被覆岩溶塌陷柱的可识别位置,及时对原有的带状巷道设计进行了修改,不仅避免了潜在的人为地雷淹没事故和工程上的大量金钱,而且节省不必要的大量资金。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号