Control of Wind Farm Performance Risk in the EPC Contract

机译:EPC合同中风电场绩效风险的控制

获取原文
获取原文并翻译 | 示例

摘要

To address the risk of project under-performance, technical characteristics and qualities of the wind plant are defined as part of the EPC contract. Guarantees are put in place to set the minimum level of performance acceptable to the principal. Tests are then typically used to verify whether the agreed project characteristics are met. In case of under-performance Liquidated Damages represent one means of compensation. This paper discusses which types of Guarantees are typically used, how tests can be defined to identify under-performance in a practical way and how Liquidated Damages can appropriately compensate for poor technical plant performance.
机译:为了解决项目绩效不佳的风险,将风电厂的技术特征和质量定义为EPC合同的一部分。设置担保以设置委托人可接受的最低性能水平。然后通常使用测试来验证是否满足约定的项目特征。在业绩不佳的情况下,违约金是一种赔偿手段。本文讨论了通常使用哪种类型的担保,如何以实际方式定义测试以识别绩效不佳以及违约金如何适当弥补技术工厂的不良绩效。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号