【24h】

Link Slab Continuity Detail on Long-Span Bridges

机译:链接大跨度桥梁的平板连续性细节

获取原文
获取原文并翻译 | 示例

摘要

Many existing and new steel and concrete bridges with simply supported girders where the deck is made continuous over the supports have shown cracking of the deck and often complete separation at the point of continuity. Improvements to the continuity detail can be made for both steel and concrete superstructures to decrease long-term maintenance costs of this detail. Continuity can be achieved in simple span steel girder bridges by connecting the simply supported girders with a plate to the top flanges of girders in adjacent spans then pouring the deck continuously over the location of the former joint. In simple span prestressed concrete girder bridges, the continuity is achieved by pouring the deck continuously over the piers between the girders of adjacent spans. The paper details several continuity options used in both steel and concrete structures.
机译:许多现有的和新建的钢和混凝土桥梁,其梁的支撑都是连续的,这些梁使支撑在支撑上连续,因此,支撑开裂并经常在连续性点处完全分开。可以对钢和混凝土上部结构进行连续细节的改进,以减少该细节的长期维护成本。在简单跨度的钢梁桥中,可以通过将带有板的简单支撑的梁连接到相邻跨度的梁的顶部凸缘上来实现连续性,然后将桥面连续浇筑在前一个节点的位置上。在简单跨度的预应力混凝土箱梁桥中,通过将甲板连续浇筑在相邻跨度的箱梁之间的桥墩上来实现连续性。本文详细介绍了钢结构和混凝土结构中使用的几种连续性选项。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号