【24h】

Incremental Launching of Final Composite Bridge Deck

机译:最终复合桥面的增量发射

获取原文
获取原文并翻译 | 示例

摘要

The paper explains new technological processes, static analysis, structural details and monitoring during launching. The bridge deck cast in workshop is not deformed and all cycle operations go on in one location. The structure was constructed with high accuracy. The erection speed was 18 m per week. A special balanced static indeterminate system was developed to decrease the influence of horizontal friction forces on flexible piers and abutments and to ensure the stability of temporary piers during launching.
机译:本文介绍了新的技术流程,静态分析,结构细节以及发射期间的监控。车间浇筑的桥面不会变形,所有循环操作都在一个位置进行。该结构的建造精度很高。架设速度为每周18 m。开发了一种特殊的平衡静态不确定系统,以减少水平摩擦力对柔性墩台和桥台的影响,并确保下水时临时墩台的稳定性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号