首页> 外文会议>24th international conference on solid waste technology and management >Driving Sustainable Waste Management: Tools for assessing the suitable sites for waste management facilities in the Midland of England
【24h】

Driving Sustainable Waste Management: Tools for assessing the suitable sites for waste management facilities in the Midland of England

机译:推动可持续废物管理:评估英格兰中部地区废物管理设施合适场所的工具

获取原文
获取原文并翻译 | 示例

摘要

Land use planning for facilities has become a key issue in England as previously, prolonged disputes in proceedings, due to public opposition, has meant that waste management facilities have taken an excessive period of time to be completed and start operating. This research identifies the impact of relatively recently introduced Regulations on the possible development of new non-municipal wastes management facilities in Northamptonshire, an English County in the East Midlands of England. The results of the research will help provide guidance to policy makers and planners at all levels so as to enable them to make informed decisions on the selection and funding for possible new facilities, based upon a number of management options, to house new facilities. The results show that for some management routes there is the likely future demand for a number of additional new facilities that are on a local, county scale e.g. Waste Electrical and Electronic Equipment (WEEE). In other cases, there is no clear demand for future expansion e.g. Hazardous Waste facilities. It has been shown, that to increase the success of planning applications for required facilities, a new emphasis of co-ordained decision making, on the basis of sound evidence from a Regulatory Impact Assessment, is required by political decision makers.
机译:像以前一样,设施的土地使用规划已成为英格兰的一个关键问题,由于公众的反对,诉讼过程中的争端持续了很长时间,这意味着废物管理设施需要花费过多的时间才能完成并开始运行。这项研究确定了相对较新引入的法规对北安普敦郡(英格兰东米德兰兹郡的英格兰县)新的非市政废物管理设施的可能开发的影响。研究结果将有助于为各级决策者和规划者提供指导,使他们能够根据多种管理选择,在选择和资助可能的新设施方面做出明智的决定,以容纳新设施。结果表明,对于某些管理路线而言,未来可能会对当地县级范围内的许多其他新设施产生需求,例如废弃电子电气设备(WEEE)。在其他情况下,对未来的扩展没有明确的需求,例如危险废物设施。已经表明,为了增加对所需设施的规划申请的成功率,政治决策者需要在监管影响评估的可靠证据的基础上重新强调共同制定的决策。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号