首页> 外文会议>21st International conference on port and ocean engineering under arctic conditions 2011.;vol. 2. >OFFSHORE PLATFORMS AND DETERMINISTIC ICE ACTIONS: KASHAGAN PHASE 2 DEVELOPMENT: NORTH CASPIAN SEA
【24h】

OFFSHORE PLATFORMS AND DETERMINISTIC ICE ACTIONS: KASHAGAN PHASE 2 DEVELOPMENT: NORTH CASPIAN SEA

机译:海洋平台和确定性的冰行动:喀沙干第二阶段开发:北卡比海

获取原文
获取原文并翻译 | 示例

摘要

The Kashagan Development requires many offshore platforms. This paper reviews the types of platforms in use and being designed for the Kashagan development. Ice loading scenarios are reviewed and the corresponding ice interaction models are described. Examples of deterministic methods and ice loads are given but noting the benefits of advancing the methods to include probabilistic approaches, which are described in an accompanying paper in this conference.
机译:Kashagan开发项目需要许多海上平台。本文回顾了为Kashagan开发而使用和设计的平台类型。审查了冰加载场景并描述了相应的冰相互作用模型。给出了确定性方法和冰荷载的示例,但指出了将方法改进为包括概率方法的好处,这在本次会议的随附文件中进行了描述。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号