【24h】

Microtunnelling Innovations

机译:微隧道创新

获取原文
获取原文并翻译 | 示例

摘要

Beside the standard requirements on microtunnelling some of today’s main requirements are to increasernjacking length, driving in changing ground conditions or access to the tunnel face. To meet thesernrequirements it is necessary to reduce the friction on the pipe conduit, to increase effectiveness and life timernof cutter tools and to install modern technical components. Herrenknecht AG`s Automatic BentoniternLubrication System and the Fine Particle Flushing circuit are technical developments to reduce the friction onrnthe pipe conduit. AVN machines bigger than ID 1200 mm offers access to the tunnel face even underrngroundwater in combination with an airlock system. Special Back Loading System make exchange of cutterrntools underground possible. The standard ELS laser guidance system can be extended by HerrenknechtrnAG`s long distance and curve guidance system SLS- RV. In contrast to the SLS- RV the Gyro TunnellingrnSystem is available, which does not need a ELS and which is installed directly in the machine. The scope ofrninnovative components for today’s requirements is completed by parts like cone crusher, high pressurernflushing and intermediate jacking stations.
机译:除了微隧道的标准要求外,当今的一些主要要求还包括增加起重长度,在不断变化的地面条件下行驶或进入隧道工作面。为了满足最新的需求,有必要减少管道上的摩擦,增加刀具的使用寿命和使用寿命,并安装现代技术组件。海瑞克股份公司的自动Bentonitern润滑系统和细颗粒冲洗回路是技术发展,旨在减少管道上的摩擦。大于ID 1200毫米的AVN机器结合气闸系统,甚至可以进入地下水,甚至可以进入隧道工作面。特殊的后装系统使在地下更换刀具成为可能。 HerrenknechtrnAG的长距离和弯道引导系统SLS-RV可以扩展标准的ELS激光引导系统。与SLS-RV相比,可以使用Gyro TunnellingrnSystem,它不需要ELS,并且直接安装在机器中。满足当今要求的创新组件的范围由圆锥破碎机,高压冲洗和中间顶升站等零件完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号