Directional drilling perforates big water main

机译:定向钻井射孔大水管

获取原文
获取原文并翻译 | 示例

摘要

October 2000 a contractor performing a directional drilling in relation to a project of conveying light guidesrnperforated a big water main from two waterworks to greater Copenhagen area. The contractors had failed tornundertake the necessary excavation of the place of crossing before carrying out the directional drilling due tornlack of all information of existing pipes and cables. As a result two waterworks with a daily production ofrn45.000 m3 water – 25% of normal daily consumption in grater Copenhagen area - had to be out of operationrnfor three weeks, and alternative supplies to thousands of consumers had to be established overnight.
机译:2000年10月,一个承包商进行定向钻孔,涉及将光导管从两个自来水厂穿孔到大哥本哈根地区的大型水管穿孔项目。由于缺乏现有管道和电缆的所有信息,承包商在进行定向钻孔之前未能对过路处进行必要的开挖。结果,两个日处理水量为4.5万立方米的自来水厂(占哥本哈根刨丝器地区正常日用水量的25%)必须停运三周,并且必须在一夜之间建立成千上万消费者的替代供水。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号