Between 1997 and April 2001 four instrumented 200mm high-density polyethylene pipes (DR-17) and tworn150mm medium-density polyethylene pipes (DR-11) were installed under controlled conditions at thernUniversity of Waterloo field test site using a midi directional drill. Pipe installation lengths of 55, 90 and 180mrnwere investigated. Instrumentation was installed on the drill rig and pipe to monitor their performance duringrnboring and pipe installation. Instrumentation was used to monitor drill rig hydraulic pressures, pipe strain andrnload, and slurry pressure adjacent to the pipe. Two of the six pipe installations were exhumed 8 and 12rnmonths following installation to determine the condition of the drilling fluid in the bore, bore and pipe ovality,rnpipe rotation along the bore axis, and “as built” pipe vertical and horizontal profiles.rnThe paper summarizes the University of Waterloo field instrumentation program from 1997 to 2001 and itsrnmain findings: 1) There appears to be an excellent correlation between measured pipe strain, load and drillrnrig differential hydraulic fluid pressures; 2) pipe load vs. pipe installation length appears to be linear when thernpipe installation is 55m; 3) When the pipe installation is 90m or greater the measured pipe load vs.rninstallation length appears to be non-linear. 4) Pipe loads also appear to decrease when the pipe isrnapproximately 2/3 installed; 5) Pre-reaming the entire bore path prior to pipe insertion appears to reducernbore slurry pressure; 6) Drill slurry pressures appear to decrease after the installation is approximately 2/3rncomplete; 7) Field measured pipe profile during the pilot bore agrees well with the actual insitu profile; and 8)rnSlurry surrounding the pipe can consolidate to densities similar to the surrounding native soil within 8 monthsrnwhen the pipe installation occurs above the groundwater table and the native soils are predominately silt.
机译:在1997年至2001年4月之间,在滑铁卢大学现场测试现场使用受控的定向钻机,在受控条件下安装了四根200毫米高密度200mm高密度聚乙烯管(DR-17)和150毫米中密度150mm中密度聚乙烯管(DR-11)。管道安装长度分别为55、90和180mrn。将仪器安装在钻机和管道上,以监控其在钻孔和管道安装过程中的性能。仪器被用来监测钻机的液压压力,管道的应变和负荷以及管道附近的泥浆压力。六个管道安装中的两个在安装后的8个月和12个月内进行了挖掘,以确定钻井液的状况,钻孔和管道的椭圆度,管道沿钻孔轴线的旋转以及“已建好的”管道的垂直和水平轮廓。总结了滑铁卢大学1997年至2001年的现场仪表项目及其主要发现:1)测得的管道应变,载荷与钻机差动液压压力之间似乎存在着极好的相关性; 2)当管道安装为55m时,管道负载与管道安装长度之间呈线性关系; 3)当管道安装距离等于或大于90m时,测得的管道负载与安装长度之间的关系似乎是非线性的。 4)大约安装了2/3的管道时,管道负载似乎也会减少; 5)在插入管道之前预先对整个钻孔路径进行扩孔,似乎可以降低钻孔浆压力; 6)安装约2/3分钟后,钻探浆液压力似乎下降; 7)在先导孔中现场测量的管道轮廓与实际的现场轮廓非常吻合; 8)当管道安装发生在地下水位以上且原生土壤主要为淤泥时,在8个月内,围绕导管的泥浆可以固结成与周围原生土壤相似的密度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号