首页> 外文会议>2017 International Conference on ENERGY and ENVIRONMENT >Increasing energy efficiency of a combined head and power plant using the heat storage
【24h】

Increasing energy efficiency of a combined head and power plant using the heat storage

机译:使用储热装置提高联合动力头和发电厂的能源效率

获取原文
获取原文并翻译 | 示例

摘要

The demand of heat of the urban consumers registers rather great variations from one season to another. The thermal load curve flattening, in hot and intermediate seasons, is possible due to the accumulation of heat during the periods of time when the heat consumption is low and its utilization during the thermal load peak periods. The paper analyzes the integration of heat accumulation using water sensible heat in a Combined Heat and Power Plant (CHPP) from Romania, with Reciprocating Gas Engines (RGE) and hot water boilers (HWB). The solution selected presupposes the adaption of an existing heavy fuel oil tank. Utilization of heat accumulation in the CHPP makes it possible both to diminish the time of HWB utilization and the increase in the energy produced in cogeneration, and the utilization of the RGE at maximum continuous load.
机译:一个季节到另一个季节,城市消费者的热量需求变化很大。由于在热量消耗低的时间段内热量的积累及其在热负荷高峰期的利用率,在炎热和中间季节,热负荷曲线可能会变平。本文分析了罗马尼亚的联合热电厂(CHPP),往复式燃气发动机(RGE)和热水锅炉(HWB)中利用水显热产生的热量积累。选择的解决方案以现有重型燃油箱的适应为前提。 CHPP中蓄热的利用既可以减少HWB的利用时间,也可以减少热电联产中产生的能量的增加,也可以减少RGE在最大连续负载下的利用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号