首页> 外文会议>2017 International Conference on Electromechanical and Power Systems >The potential of micro grids concept implementation in the Republic of Moldova
【24h】

The potential of micro grids concept implementation in the Republic of Moldova

机译:微电网概念在摩尔多瓦共和国实施的潜力

获取原文
获取原文并翻译 | 示例

摘要

The paper draws attention on the issue of national power system modernization from inside, as a component part included in the multiple set of challenges standing before energy sector development in context of identification of the most feasible projects aimed to offer solutions to overcome problems of Moldova energy sector. When the country lack both own primary energy resources and generation capacity, being imposed to import its, and requiring for this more diversified network, having at the same time obsolete power system from the technical point of view, and not only, which was designed and constructed in the years of "60-70 of the past century, the modernization and refurbishment measures need to be implemented. To reach a high level of energy security, a serious intervention should be done in each segment of the energy chain: generation, transmission, distribution, storage, supply and consumption. The advantage of implementation of intelligent micro grids (MG) innovational concept at the level of distribution and low voltage network for consumers energy supply have been proved worldwide. In order to initiate measures of such nature, present paper emphasizes real conditions and background in the Republic of Moldova. But the decision of construction of the energy MG, like any other engineering projects depends on the results of multicriterial analysis and of the competition of pros and cons in the exercise of compromise.
机译:本文从内部引起了对国家电力系统现代化问题的关注,这是在确定最可行的项目以解决摩尔多瓦能源问题的最可行项目的背景下,能源部门发展之前面临的多重挑战中的一个组成部分。部门。当一个国家既缺乏自己的主要能源资源又没有发电能力时,就不得不进口其能源,并需要这种更加多样化的网络,同时从技术角度来看,不仅具有过时的电力系统,而且其设计和建于上个世纪60-70年,需要实施现代化和翻新措施。为了达到较高的能源安全水平,应在能源链的每个部分都进行认真的干预:发电,输电,配电,存储,供应和消耗。在全球范围内,已经证明了在配电和低压网络上为消费者能源供应实施智能微电网(MG)创新概念的优势。论文强调了摩尔多瓦共和国的实际情况和背景,但能源MG的建设决定与任何其他工程项目一样取决于多标准分析的结果以及折衷方案中优缺点的竞争。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号