A decision making system is proposed to run building projects in Malaysia and is known as System Dynamic Model. The project is under Public Private Partnership University's student accommodation. The issue exists when the private sector failed to make decision making in determining certain financial variables such as Building Lease Charges since it affects the project IRR. This IRR is an important mark for a successful project. However, it is determined by the public sector, which delays the decision making process. Furthermore, contradiction in determining this variable could arises between the sectors. In the process of making decision to determine the variable, there will be recurring revision of previous system (financial model) including recalculation and restructuring the building lease charges amount. Hence, it makes the process too complicated and slow. Therefore, this paper aims to develop System Dynamic Model (SDM) as an alternative approach to make decision faster when determining Building Lease Charges and facilitate the process of making decision. Moreover, this SDM can simulates and analyzes the sensitivity of building lease charges to the IRR. The methodology is based on quantitative technique. Data is collected and a case study on a PPP university's student accommodation project is used. From the research results, the parameters of Building Lease Charges which affected to the Project IRR within range 16% is RM38-RM39. The sensitivity histogram generated that there are 21 simulations for which, at time 23, Project IRR is between 17.6% and 21% and about 2 simulations in which it is between -2.8% and 0.60% The results give substantially more information than an expected Project IRR in making that judgment. It is proven that SDM could solve the problem for the associated determination of building lease charges. It is expected that the SDM can generate knowledge among researchers in solving the complex situation managements especially in real big development, investment and business projects.
机译:提出了一个决策系统来在马来西亚运行建筑项目,该系统被称为系统动态模型。该项目隶属于公私合营大学的学生宿舍。当私营部门无法确定某些财务变量(例如建筑物租赁费)时,就会产生问题,因为这会影响项目内部收益率。此IRR是成功项目的重要标志。但是,它是由公共部门确定的,这会延迟决策过程。此外,在各部门之间可能会出现确定此变量的矛盾。在决定确定变量的过程中,将对以前的系统(财务模型)进行反复修订,包括重新计算和重组建筑物租赁费用金额。因此,这使该过程过于复杂和缓慢。因此,本文旨在开发系统动态模型(SDM)作为替代方法,以在确定建筑物租赁费用时更快地做出决策,并促进决策过程。此外,该SDM可以模拟和分析建筑物租赁费用对IRR的敏感性。该方法基于定量技术。收集数据,并使用PPP大学学生住宿项目的案例研究。根据研究结果,在16%范围内影响项目IRR的建筑物租赁费用的参数为RM38-RM39。生成的敏感度直方图有21个模拟,在时间23时,项目IRR在17.6%和21%之间,大约有2个模拟在-2.8%和0.60%之间。结果比预期的项目提供了更多的信息IRR做出该判断。事实证明,SDM可以解决与建筑物租赁费用相关的确定问题。期望SDM可以在研究人员中解决复杂的情境管理(尤其是在真正的大型开发,投资和业务项目中)带来知识。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号