首页> 外文会议>2013 International Conference of Information and Communication Technology >Implementation of analytic network process (ANP) and analytic hierarchy process (AHP) method to determine priorities of roads to be repaired at Bogor City Department of Public Works
【24h】

Implementation of analytic network process (ANP) and analytic hierarchy process (AHP) method to determine priorities of roads to be repaired at Bogor City Department of Public Works

机译:在茂物市公共工程部实施分析网络过程(ANP)和层次分析过程(AHP)方法来确定要修复的道路的优先级

获取原文
获取原文并翻译 | 示例

摘要

One of the strategic objectives of the Department of Public Works, in particular the Directorate General of Highways is to increase the percentage of roads in good condition. Meanwhile, the number and length of roads that need to be monitored continues to increase every year. The total length of roads in Indonesia based on data from the Directorate General of Highways in 2011 was approximately 38,570.00 km, and only 15,780.88 km that are on the good condition.[1] To manage the infrastructures mentioned above, the Directorate General of Highways periodically perform maintenance or repair depending on the level of damage. Meanwhile, to choose which road will be repaired first, the DGH had difficulty because there are several factors to consider include the level of damage, cost of repairs that are needed, the type of treatment required, the function and status of the road.
机译:公共工程部,特别是公路总局的战略目标之一是增加状况良好的道路的比例。同时,每年需要监控的道路数量和长度持续增加。根据2011年公路总局的数据,印度尼西亚的公路总长约为38,570.00公里,只有15,780.88公里处于良好状态。[1]为了管理上述基础设施,公路总局会根据损坏程度定期进行维护或修理。同时,DGH在选择哪条道路首先要维修时遇到了困难,因为要考虑多个因素,包括损坏程度,所需维修费用,所需的治疗类型,道路的功能和状态。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号