首页> 外文会议>2013 IEEE Green Technologies Conference >Unscheduled Flow in Deregulated Electricity Markets: Bridging the Gap between the Western Electric Power Industry and Academia
【24h】

Unscheduled Flow in Deregulated Electricity Markets: Bridging the Gap between the Western Electric Power Industry and Academia

机译:放松管制的电力市场中的计划外流量:弥合西方电力行业和学术界之间的鸿沟

获取原文
获取原文并翻译 | 示例

摘要

Unscheduled power flows cause inequitable compensation of transmission infrastructure usage as well as a less reliable system. Accordingly, an unspecified amount of dollars in the United States are lost annually to unscheduled flows. A comprehensive survey of the literature on methods used to handle unscheduled flow in the market and the system is provided in this paper. Advantages and disadvantages are discussed with specific regard to the system and operating considerations within the Western Interconnection of the United States bulk electric system. Operating challenges within the Western Interconnection are briefly introduced. An action plan for including any of the proposed unscheduled flow mitigation mechanisms within the Western Interconnection is recommended, which includes guidance from a regulatory agency, infrastructure enhancements, and modeling efforts to determine associated impacts of the most promising methods prior to implementation.
机译:计划外的潮流会导致传输基础设施使用以及系统可靠性较差的补偿。因此,在美国,由于计划外的流量,每年损失的美元数量不确定。本文提供了有关处理市场中非计划流量的方法和系统的文献的全面综述。讨论了系统的优缺点以及在美国大电网的Western Interconnection中的运行注意事项。简要介绍了Western Interconnection内的运营挑战。建议采取一项行动计划,在Western Interconnection中包括任何拟议的非计划的流量减缓机制,其中包括监管机构的指导,基础设施的改进以及在实施之前确定最有希望的方法的相关影响的建模工作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号