首页> 外文会议>2012 Workshop on Integration of Renewables into the Distribution Grid >Evaluation of PV curtailment option to optimize PV integration in Distribution Network
【24h】

Evaluation of PV curtailment option to optimize PV integration in Distribution Network

机译:评估光伏削减方案,以优化配电网中的光伏集成

获取原文

摘要

Due to present regulatory framework,connection studies and scheme for generators (PV,Wind...) are designed to guaranty that all capacity can be injected in the feeder any time of the year in normal operation.Any injection above the connection capacity of the contract is forbidden.This can result in grid adaptations (reinforcements or heavier structural modifications) triggered by short duration constraints.It is thus rational to look for alternative solutions with better costs.Among those active curtailments (reduction of active power injection during short periods) appears to have interesting features and possible drawbacks: we develop this idea further in this paper for MV PV generation.
机译:根据当前的法规框架,旨在确保发电机的连接研究和方案(PV,风力...)的设计是为了保证正常运行中一年中的任何时间都可以在馈线中注入所有容量。禁止合同,这可能会因短期约束而导致电网适应性变化(加固或较重的结构改造),因此寻找成本更高的替代解决方案是合理的,在这些主动削减措施中(短期内减少有功功率注入)似乎具有有趣的功能和可能的弊端:我们在本文中进一步开发了这种想法,用于中压光伏发电。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号