首页> 外文会议>International Conference on Applied Robotics for the Power Industry;CARPI 2012 >The economic contrast of two structural concept used on a natatorium in Harbin
【24h】

The economic contrast of two structural concept used on a natatorium in Harbin

机译:哈尔滨游泳馆使用的两种结构概念的经济对比

获取原文
获取原文并翻译 | 示例

摘要

The original design for an underground natatorium in Harbin adopted the pile foundation as the basement, the frame as the main structure and the cast-in-situ concrete beam-slab system for the floor. However, the beams in this design were replaced by prestressed concrete beams after the construction of the basement due to their big heights. The expense spent on the previous design and the modified one has been compared in this paper, which shows that the design involved the prestressed concrete beams could cut the cost, as well as decrease the beam height, increase net height of the room, and lead to better effect of the natatorium.
机译:哈尔滨地下游泳馆的原始设计采用桩基础为地下室,框架为主体结构,地板为现浇混凝土梁-平板系统。但是,由于地下室的高度很大,在地下室建造后,该设计中的梁被预应力混凝土梁代替。本文比较了前一次设计和修改后的费用,表明设计涉及预应力混凝土梁可以削减成本,并减少梁的高度,增加房间的净高度和铅。更好地发挥游泳馆的作用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号