RISK MANAGEMENT AND RELATIONSHIPS SUCCESSFULLY OVERCOME CHALLENGES

机译:风险管理和关系成功克服了挑战

获取原文
获取原文并翻译 | 示例

摘要

The WRCT Tunnel in Northern Kentucky is currently under construction and therntunnel has successfully holed-through. The design, procurement and construction ofrnthis tunnel included several political, technical and construction-related risks and challenges,rnincluding: methane gas; low cover; internal corrosion; creek crossings; strongrnpublic opposition; the rejection of bids, and a 40-year-old TBM. This paper describesrnthe design and construction methods used to identify and mitigate the various challengesrnto the project’s success. More importantly, the paper describes the collaborationrnduring construction between the Owner, Engineer and Contractor and how these relationshipsrnare as important as the Contract Documents to a successful project.
机译:肯塔基北部的WRCT隧道目前正在建设中,隧道已成功打通。该隧道的设计,采购和施工包括若干与政治,技术和施工有关的风险和挑战,包括:低盖内部腐蚀;小溪口岸;强烈的公众反对;拒绝投标和40岁的TBM。本文介绍了用于识别和缓解项目成功所面临的各种挑战的设计和施工方法。更重要的是,本文描述了业主,工程师和承包商之间的施工合作,以及这些关系对成功项目的重要性与合同文件一样重要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号