TECHNICAL APPROACH ON BID PREPARATION TO SUCCEED ON THE ALASKAN WAY PROJECT

机译:在阿拉斯加公路项目上成功进行投标准备的技术方法

获取原文
获取原文并翻译 | 示例

摘要

The WSDOT has decided to replace the old Alaskan Way Viaduct on the SR99 forrna single bore tunnel able to allocate two lanes on each direction. In accordance withrnthe ground conditions existing on Seattle a pressurized TBM is the right choice. But, thernrequired 57.4' on excavation diameter goes by far, beyond the existing TBM’s and willrnrequire the application of the newest technologies on its development.rnTo succeed on this bid a careful and documented technical approach was made,rnevaluating first the two options between slurry and EPB to excavate the tunnel, followedrnby the selection of the most effective and proved systems and devices, sometimesrnduplicated, in order to build the perfect machine for the biggest TBM tunnel everrnbuilt, till now.rnNot only the TBM, but also the impact of the new urban tunnel on the surroundingsrnmust be deeply considered during the bid stage in order to estimate the cost and schedulernof the ground treatments required to minimize the volume loss and consequently tornprogress with the excavation in the safest way for all the parties (see Figure 1).
机译:WSDOT已决定在能够在每个方向分配两条车道的SR99 forrna单孔隧道上更换旧的阿拉斯加公路高架桥。根据西雅图现有的地面条件,加压TBM是正确的选择。但是,开挖直径所需的57.4'远远超出了现有的TBM,将需要在其开发中应用最新技术。为成功中标,我们采取了谨慎且有据可查的技术方法,首先重新评估了浆液和砂浆之间的两种选择。 EPB开挖隧道,然后选择最有效,最成熟的系统和设备,有时会重复一些,以便为迄今为止建造的最大的TBM隧道建造完美的机器。不仅是TBM,还有新隧道的影响在投标阶段,必须深思熟虑周围的城市隧道,以便估算成本并安排对地面处理的要求,以最大程度地减少体积损失,从而以最安全的方式对各方进行开挖施工(见图1)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号