首页> 外文会议>2011 rapid excavation and tunneling conference >CRENSHAW/LAX TRANSIT CORRIDOR: EXPANDING TRANSIT IN LOS ANGELES
【24h】

CRENSHAW/LAX TRANSIT CORRIDOR: EXPANDING TRANSIT IN LOS ANGELES

机译:CRENSHAW / LAX TRANST走廊:在洛杉矶扩展过境

获取原文
获取原文并翻译 | 示例

摘要

The Los Angeles County Metropolitan Transportation Authority (Metro) hasrnembarked upon a major capital expansion program to improve public transit servicernand mobility in Los Angeles County. As part of this program, the $1.7-billion Crenshaw/rnLAX Light Rail Project will interline with the Metro Green Line, and provide connectionsrnto the Exposition Line and Los Angeles International Airport (LAX) along an 8.5-milernalignment. The guideway includes approximately 3.5 miles of underground construction,rninvolving extensive use of both cut-and-cover and mined methods. This paperrndescribes the technical challenges, physical constraints, and funding challenges thatrnhave defined the project configuration, and outlines the strategy for project delivery tornmeet the projected revenue service date of June 2018.
机译:洛杉矶县城市交通管理局(Metro)实施了一项重大的资本扩张计划,以改善洛杉矶县的公共交通服务和交通。作为该计划的一部分,耗资17亿美元的Crenshaw / rnLAX轻轨项目将与Metro Green Line交汇,并沿着8.5英里的对中线提供至博览会线和洛杉矶国际机场(LAX)的连接。该导轨包括约3.5英里的地下建筑,涉及广泛使用挖填和开采方法。本文描述了已定义项目配置的技术挑战,物理约束和资金挑战,并概述了满足2018年6月预计收入服务日期的项目交付策略。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号