DESIGN, CONSTRUCTION, AND OPERATION OF UNLINED PRESSURE TUNNELS: SUGGESTIONS FOR GOOD INDUSTRY PRACTICE

机译:无压力隧道的设计,施工和操作:关于良好行业实践的建议

获取原文
获取原文并翻译 | 示例

摘要

The design, construction and operation of unlined pressure tunnels for the conveyancernof water requires a comprehensive evaluation of a number of key technicalrnissues including the prevailing geological conditions prior to construction, considerationrnof hydraulic requirements, operations, impact of scour on long term tunnel stability,rnmethod of excavation, evaluation of final lining, maintenance access requirements duringrnoperations, debris accumulation and hydraulic design of rock traps, and an evaluationrnof the encountered geological conditions from detailed mapping during construction.rnWith the continued construction of an increasing amount of unlined pressure tunnelsrnparticularly for hydropower development a number of lessons have been learned overrnthe past few decades regarding the design, construction and operation of unlined pressurerntunnels. The acceptability of unlined pressure tunnels for any given site needs tornconsider environmental impacts and the potential for external influences during operations.rnMany unlined pressure tunnels have been successfully constructed and operatedrnfor decades without any major problems. Some rock environments appear to berncommonly associated with the presence of adverse and dissoluble mineral infillingsrnthat can result with excessive scour that can manifest into significant blockages andrncollapses. The uncertainty associated with the requirements for final tunnel supportrnand lining suggests that risk-sharing contracts offer the best choice to owners to providerna reliable conveyance tunnel for low-risk operations. This paper serves to addressrna number of key technical issues for practitioners and offers suggested guidelines forrngood industry practice.
机译:用于输送水的无衬砌压力隧道的设计,施工和运行需要对许多关键技术问题进行全面评估,包括施工前的主要地质条件,考虑水力要求,运行,冲刷对长期隧道稳定性的影响,方法等。开挖,最终衬砌评估,运营期间的维护通道要求,集水弯道的碎屑堆积和水力设计,以及在施工过程中通过详细的制图来评估所遇到的地质条件。随着持续建造越来越多的无衬砌压力隧道,特别是用于水电开发在过去的几十年中,已经获得了有关无衬砌压力隧道的设计,建造和操作的许多经验教训。对于任何给定的位置,无衬砌压力隧道的可接受性都需要考虑环境影响和运营过程中的外部影响的可能性。许多无衬砌压力隧道已经成功建造和运营了数十年,没有任何重大问题。某些岩石环境通常与不利的和可溶的矿物填充物存在有关,这可能导致过多的冲刷,这些冲刷可表现为严重的堵塞和坍塌。与最终隧道支护和衬砌要求有关的不确定性表明,风险分担合同为船东提供低风险运营可靠的运输隧道的最佳选择。本文旨在为从业者解决一些关键技术问题,并为良好的行业实践提供建议的指导原则。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号