首页> 外文会议>2011 rapid excavation and tunneling conference >INTERVENTIONS AND CHAMBER ACCESS IN PRESSURIZED FACE TBMs
【24h】

INTERVENTIONS AND CHAMBER ACCESS IN PRESSURIZED FACE TBMs

机译:加压面部掘进机的干预和密室访问

获取原文
获取原文并翻译 | 示例

摘要

Difficult variable ground, high face pressure and large diameters have becomerncommon challenges for many tunneling projects. As a result TBMs require, as anrnessential feature, personnel access to the excavation chamber for inspection and maintenance.rnWhereas previously, technical specifications for seal systems or structures setrnthe limitations, the necessity for options for chamber interventions are now becomingrnone of the key determining factors on today’s modern TBMs. This paper will highlightrnthe different state of the art arrangements for chamber interventions as well as the latestrndevelopments and related efforts to reduce intervention frequencies and durations.
机译:困难的可变地面,高工作面压力和大直径已成为许多隧道工程的常见挑战。结果,TBM需要作为人员的特征才能进入开挖室进行检查和维护。以前,密封系统或结构的技术规范设定了限制,现在,选择开槽干预的必要性已成为决定因素的关键因素当今的现代TBM。本文将重点介绍腔室干预的最新技术安排,以及减少干预频率和持续时间的最新进展和相关工作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号