GEOTECHNICAL CONDITIONS AND DESIGN CONSIDERATIONS FOR CENTRAL SUBWAY PROJECT IN DOWNTOWN SAN FRANCISCO

机译:旧金山市区中心地铁工程的岩土条件和设计注意事项

获取原文
获取原文并翻译 | 示例

摘要

The San Francisco Central Subway is a $1.6 billion underground extension of thernThird Street Light Rail Project in the heart of the most densely populated areas of SanrnFrancisco. The project includes 1.7-mile-long, 20-ft diameter twin tunnels, five crossrnpassages, two portal/shaft structures and three deep underground stations. The complexrngeological conditions and urban setting strongly influenced the design of the tunnelsrnand associated structures and pose considerable challenges. Highlights of therndesign include cut-and-cover excavations up to 100-foot in depth; top-down excavationsrnof the TBM Launch box, portal, and stations in soft soils with high water tables;rnsequential excavations of a station in soft ground and weak rock; and TBM tunnelingrnwith mixed face conditions. Key design challenges include the use of deep diaphragmrnwalls and secant piles and extensive ground improvements. This paper briefly describesrnthe geotechnical conditions and challenges for the project, and the design solutions thatrnare being developed.
机译:旧金山中央地铁是thernThird街轻轨项目的地下扩建工程,耗资16亿美元,位于桑恩·弗朗西斯科最密集的地区的心脏地带。该项目包括1.7英里长,20英尺直径的双隧道,五个横穿通道,两个门/竖井结构和三个深地下站。复杂的地质条件和城市环境极大地影响了隧道及其相关结构的设计,并带来了巨大的挑战。 Therndesign的亮点包括挖深达100英尺的开挖挖掘;在高地下水位的软土中的TBM发射箱,门户和车站进行自上而下的开挖;在软土地基和软岩中依次进行车站的开挖;和TBM掘进具有混合面条件。关键的设计挑战包括使用深隔膜墙和割线桩以及广泛的地面改进。本文简要介绍了该项目的岩土条件和挑战以及正在开发的设计解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号