SHAFT DESIGN AND CONSTRUCTION CONSIDERATIONS FOR THE BAY TUNNEL PROJECT

机译:海湾隧道项目的竖井设计和施工注意事项

获取原文
获取原文并翻译 | 示例

摘要

The San Francisco Bay Area’s primary water supply system, highly vulnerable tornseismic damage from the nearby San Andreas and Hayward fault zones, consists ofrnaging and deteriorated pipelines crossing under the Bay.rnThe 5-mile Bay Tunnel Project will replace this system with the first tunnel excavatedrnby a TBM underneath the Bay and environmentally-sensitive salt marshes withrnno intermediate shafts. Contract includes two shafts which will serve as a means ofrnconveyance, access and temporary ventilation for the completed Bay Tunnel project.rnThis paper presents the design considerations and slurry wall construction methodrnof the 136-feet deep Ravenswood shaft.
机译:旧金山湾区的主要供水系统极易受到附近的圣安德烈亚斯和海沃德断裂带的地震破坏,包括破坏和恶化的穿越海湾的管道。5英里海湾隧道项目将用第一条挖掘出的隧道取代该系统海湾下方的TBM和对环境敏感的盐沼,中间没有竖井。合同包括两个竖井,这些竖井将用作完成的海湾隧道项目的运输,进出和临时通风的手段。本文介绍了136英尺深的Ravenswood竖井的设计考虑因素和泥壁施工方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号