摘要

The Pfaender Tunnel bypasses the residential area of the city of Bregenz at thernnorthern end of the A14 Rheintal Motorway. The alignment of its second bore runs underrnthe Pfaender massif for more than 6.5 km. The route runs through geology describedrnas the standing midland molasse, a sequence of beds from the Neogenic period (LaternTertiary), today mostly consisting of conglomerate, sandstones, marl-sandstones,rnmarl and clay-marl. The second tube was excavated with a single-shield tunnel boringrnmachine working from the starter tunnel in the North to an existing short bore inrnthe South. The tunnel’s standard cross-section is a circular (bored diameter 11.92 m)rnand the external diameter of the segmentally concreted lining is 11.62 m. This paperrndeals with the main issues related to the issues of an alternative TBM tunneling tenderrntaking into account the swelling tendency of the marl, and also deals with the constructionrnof Austria’s first road tunnel to be driven with a TBM. The problems encounteredrnwhen driving a TBM in divided cross-sections (bench and invert sections without toprnheading) in soft ground and the solutions adopted on site are discussed. This paperrnalso deals with the complex construction of voluminous enlargements (traffic lay-bys,rnservice niches, ventilation caverns), where the circular segmentally lined TBM tunnelrnhad to be widened up and relined using the SEM/NATM shotcrete tunneling method.
机译:Pfaender隧道绕过了A14 Rheintal高速公路北端的Bregenz市的居民区。第二个孔的对准线在Pfaender地块下延伸了6.5公里。这条路线贯穿地质描述中的陆生中陆蜜糖浆,这是新生代(LaternTertiary)的一系列层序,如今主要由砾岩,砂岩,泥灰砂岩,rnmarl和黏土泥灰岩组成。第二个管子是用单盾构隧道掘进机开挖的,该掘进机从北部的启动隧道一直延伸到南部的现有短孔。隧道的标准横截面为圆形(钻孔直径11.92 m),分段混凝土衬砌的外径为11.62 m。本文主要针对与替代性TBM隧道招标相关的主要问题,同时考虑了泥灰的膨胀趋势,并且还讨论了奥地利第一条由TBM推动的公路隧道施工。讨论了在软土地基中划分截面(无顶面的台面和反面部分)掘进TBM时遇到的问题以及现场采用的解决方案。本文还涉及大量扩建的复杂结构(交通停泊处,服务小生境,通风洞),其中圆形分段衬砌的TBM隧道必须使用SEM / NATM喷射混凝土隧道方法进行加宽和重新衬砌。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号