首页> 外文会议>2010 international symposium on multi-field coupling theory of rock and soil media and its applications >Diseases Analysis of Unsymmetrical Loading Tunnel and Study of Its Treatments
【24h】

Diseases Analysis of Unsymmetrical Loading Tunnel and Study of Its Treatments

机译:非对称荷载隧道的病害分析及治理研究

获取原文
获取原文并翻译 | 示例

摘要

According to the tunnel defects that occurred during construction of a certain unsymmetrical loading tunnel in Ya-Lu high-way, the main reasons of the defects occurrence are analyzed by from three aspects: the terrain, the geologic agent, the climatic factor and the construction factor. Then the remediation plan and construction process of the defects at the location of unsymmetrical loading tunnel are introduced. Thirdly, by ANSYS software, the excavation process at the location of unsymmetrical loading is simulated, and the changes of stress field in the excavation process is also reflected, then compared to the position of occurred defects in order to verified the reasonableness of the disease treatments method. At last, the danger parts of unsymmetrical loading tunnel excavation and the treatments of defects are summarized to offer reference for workers of the tunnel.
机译:根据鸭绿公路某条非对称荷载隧道施工过程中发生的隧道缺陷,从地形,地质因素,气候因素和施工三个方面分析了缺陷发生的主要原因。因子。介绍了非对称加载隧道位置缺陷的修复方案和施工过程。第三,利用ANSYS软件模拟了非对称荷载位置的开挖过程,并反映了开挖过程中应力场的变化,然后与发生缺陷的位置进行比较,以验证疾病处理的合理性。方法。最后,总结了非对称荷载隧道开挖的危险部分和缺陷的处理方法,为隧道工人提供参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号