首页> 外文会议>2010 International conference on communication and vehicular technology; 2010 International conference on power and energy systems. >Research on Power Benefits Assessment of SiPing Hydropower Station under the Operation of Sanliping Hydropower Station
【24h】

Research on Power Benefits Assessment of SiPing Hydropower Station under the Operation of Sanliping Hydropower Station

机译:三里坪水电站运行下四平水电站电力效益评估研究。

获取原文
获取原文并翻译 | 示例

摘要

In order to research on the effect on the hydropower benefits of SiPing Hydropower station by SaLiPing hydropower station in operation, cascaded optimal operation model has been established, with the objective function of maximizing minimum power and maximizing the generated energy capacity respectively, 0.5 times power probability is selected as system power constraint The hydropower benefits in SiPing hydropower station is calculated before and after SanLiPing in operation. The result shows that after SanLiPing in operation, the hydropower benefits in SiPing are improved through the compensation of SanLiPing, as well as its flood control condition, brought huge economic benefits to cascaded hydropower stations.
机译:为了研究萨里坪水电站在运行中对四平水电站水电效益的影响,建立了级联最优运行模型,其目标功能是最小化功率最大化和发电量最大化,功率概率为0.5倍。选择系统功率约束作为四平水电站运行前和运行后的水电收益。结果表明,三里坪水电站投入运行后,通过三里坪水库的补偿和防洪条件,四平电站的水电效益得到了改善,给梯级水电站带来了巨大的经济效益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号